Now you know how the pyramids were built!

What next?

Try it yourself ↓

How were the pyramids built?

▶ 4:58 video · Watch on YouTube

  1. 0:00 A mountain made by hand
  2. 0:48 Who built it?
  3. 1:44 Cutting and shipping the stone
  4. 2:37 The wet-sand trick
  5. 3:19 Up the ramps
  6. 4:13 Raise it yourself

Your turn

Build a pyramid, one step at a time

Be a pyramid builder!

Each lab is one step from the video. Slide, tap and test the ideas yourself.

Each lab isolates one piece of the evidence. The models are simplified; see the notes.

Tap the buttons and slide the sliders.

1

How fast did they work?

The pace of construction

Fast or slow?

Change how many years the build took. How many blocks a day is that?

2.3 million blocks ÷ (years × 365), over a ten-hour day. Lehner's own estimate is about 340 a day.

Slide it. Watch the pyramid go up!

Blocks a day = 2,300,000 ÷ (years × 365); minutes per block over a ten-hour working day.

2

Clues from the workers' town

The archaeology of the workforce

Look for clues!

Tap each clue. What does it tell us about who built the pyramid?

Cemetery, skeletons, settlement and graffiti: each is independent evidence against the slave myth.

Tap a clue. Who built the pyramid?

3

Follow the stone

Three materials, three supply routes

Where did the stone come from?

Tap each kind of stone to follow its journey on the map.

Local core limestone, Tura casing across the Nile, and Aswan granite far upriver.

Tap a stone. Watch it travel!

Map not to scale.

4

The wet-sand trick

Sliding friction on wet sand

Wet the sand!

Pour water with the slider and count how many pullers you need.

Friction falls to about half at the optimum wetness, then rises again (Fall et al. 2014).

Slide to add water. Do you need more pullers, or fewer?

Pullers: about 8 for a 2.5-tonne block on wetted sand (Stocks), so about 16 on dry sand. The rise past the optimum is drawn qualitatively.

5

Pick a ramp

Competing ramp hypotheses

Try each ramp design and weigh up its strengths and problems.

The straight ramp is drawn to true scale at 1 in 10 against the pyramid's height.

6

Raise it yourself

Volume vs height

Build the pyramid!

Drag the slider to build the pyramid, course by course. How much stone is in place a third of the way up?

Share of volume below height fraction h = 1 − (1 − h)³.

Slide it and build the pyramid!

How were the pyramids built?

Long, long ago, in Egypt, people built giant pyramids by hand. The biggest one, the Great Pyramid, was made for a king called Khufu. It is made of lots and lots of stone blocks, and one block is heavier than a car!

1. Who built them?

Egyptian workers built them. They were paid and fed. They lived in a busy town with bakeries, ate bread and meat, and took turns working. When workers got hurt, they were cared for. Their teams had proud names, like "Friends of Khufu".

2. Cutting the stone

Most of the stone came from a quarry right next door. Workers cut it with copper tools and stone hammers. Shiny white stone came by boat on the river Nile.

3. The wet-sand trick

Workers pulled the blocks on wooden sleds. A worker poured water on the sand in front of the sled. Wet sand stays firm, so only half as many people were needed to pull!

4. Up and up

Workers built ramps, like big sloping paths, to drag blocks up high. Most of the stone went at the bottom, where the pyramid is widest.

Did you know? A boss named Merer wrote a diary about carrying stone by boat to the pyramid. It is one of the oldest diaries ever found!

← More explainers

How were the pyramids built? The short answer

The pyramids of Giza were built about 4,500 years ago by teams of paid, well-fed Egyptian workers, not slaves or aliens.35 They cut limestone blocks with copper chisels and stone hammers,5 floated heavier and finer stone down the Nile by boat,6 dragged blocks on wooden sledges over wetted sand,78 and raised them with ramps of mud brick, rubble and earth, using levers near the top.110

We know most of this from real evidence: the workers' town and cemetery, their tools, the quarries, and even a 4,500-year-old logbook. The one part experts still argue about is exactly how the ramps were arranged.110

How big is the Great Pyramid?

The Great Pyramid was built for King Khufu, the second king of Egypt's 4th dynasty. It is the largest of the three pyramids at Giza.1

MeasurementGreat Pyramid of Khufu
Original height147 m (481 ft); about 138 m today
Each side of the baseabout 230 m (756 ft)
Number of blocksabout 2.3 million
Average blockabout 2.5 tonnes (heavier than a car)
Heaviest blocksgranite ceiling beams of 25 to 80 tonnes
Total weightabout 5.75 million tons
Slope of the sides51°52′, lined up with north, south, east and west

If it took 20 years, the builders had to set about 315 blocks a day. That's one block every two minutes, all day, for two decades.13 Egyptologist Mark Lehner worked out a similar figure of about 340 stones a day.3

2,300,000 blocks ÷ (20 years × 365 days) ≈ 315 blocks a day

Who built the pyramids? (Not slaves)

For centuries people assumed slaves built the pyramids. The evidence says otherwise. In 1990 a tourist's horse stumbled on a low mud-brick wall south of the Sphinx. Archaeologist Zahi Hawass dug there and found the cemetery of the pyramid workers: about 600 people, with the tombs of overseers surrounded by the simpler tombs of labourers.53 Being buried with honour right beside the king's pyramid is not how slaves were treated.

The skeletons tell a story too. Some workers had broken hands that had been splinted with wood, and one man had a leg operation and lived another 14 years.3 Injured workers got medical care.

Nearby, Mark Lehner excavated a whole workers' town, sometimes called the Lost City. It had long sleeping halls for about 1,600 to 2,000 people (perhaps twice that if they had two levels), scores of bakeries, and piles of bones from prime beef, sheep and goats.45 The workers were fed well.

Crews even left graffiti on the blocks with their team names, such as "Friends of Khufu" and the "Drunkards of Menkaure". Crews were organised into gangs and smaller teams, and people rotated in for a stint of work and then went home.34

How many people built the Great Pyramid?

The Greek historian Herodotus said 100,000 men, but he was writing about 2,000 years after the pyramid was finished. Modern estimates are about 20,000 workers, including support staff such as bakers, with roughly 10,000 doing the quarrying, hauling and setting.134

Where did the stone come from?

  • Core blocks: yellowish limestone cut from quarries right on the Giza plateau, just south of the pyramids.13
  • Smooth outer casing: fine white limestone from Tura, on the other side of the Nile, about 12 miles south of Cairo.6 Almost all of it was stripped away in later centuries.1
  • Granite: for the King's Chamber, brought from Aswan, far to the south, by river.611

Workers cut soft limestone with copper chisels, stone hammers and wooden mallets. They had no iron.511

The Diary of Merer: a logbook from the building site

In 2013, archaeologist Pierre Tallet found the oldest papyrus scrolls ever discovered at an ancient harbour called Wadi al-Jarf, on the Red Sea. One was the logbook of an official named Merer, who led a crew of about 200 men. He records loading his boats with limestone at Tura and sailing it to Giza, in the 27th year of Khufu's reign.611 The Egyptians dug canals and a harbour so boats could reach close to the building site.6

How did they move the blocks? The wet-sand trick

On land, blocks rode on wooden sledges pulled with ropes. A wall painting in the tomb of Djehutihotep shows a giant statue on a sledge, with a man standing at the front pouring water onto the sand.89

In 2014, physicists at the University of Amsterdam tested why. On dry sand, a heap of sand builds up in front of the sledge. With the right amount of water, tiny water bridges glue the grains together, so the sand becomes about twice as stiff and the heap never forms. That halves the pulling force, so half as many people are needed.789 Too much water, though, and the friction goes up again.7

How did they get the blocks up? The ramp theories

Most Egyptologists think the builders used ramps of mud brick, rubble and earth, with levers to help with the last, highest blocks. But no ramp survives in place, so the exact layout is still debated.110

Ramp ideaStrengthProblem
One straight rampSimpleAt a 1-in-10 slope it would need to be about 1.5 km long, bigger than the pyramid
Zigzag up one faceMuch shorterTight turns for long hauling teams
Spiral around the sidesUses less materialLittle archaeological evidence; awkward turns at every corner
Internal ramp (Houdin)Explains why no ramp remainsUnproven; many experts doubt it

There is a real clue from Khufu's own time. At the Hatnub alabaster quarry, archaeologists from the University of Liverpool and the French Institute (IFAO) found a steep ramp with a staircase on each side and rows of post holes. Workers may have looped ropes around wooden posts to haul sledges up slopes of 20% or more.1012

The surprise hidden in the shape

A pyramid is widest at the bottom, so most of its stone sits low down. By the time the builders were one third of the way up, about 70% of all the stone was already in place. The share below any height fraction h is:

stone placed = 1 − (1 − h)³ → at h = ⅓, that's about 70%

The last blocks were few, but they had to be lifted the highest.

Why were the pyramids built?

The pyramids were royal tombs. Each was part of a complex with temples and a causeway to the Nile valley.2 Egyptians believed the pyramid helped the king's spirit live on after death, which they thought kept the world in order.5 Building it drew in the whole country: granite from the south, food from the delta and limestone from Tura. Workers who rotated through Giza went home having seen their nation work as one.46

Common misconceptions

"Slaves built the pyramids." The workers had their own tombs beside the pyramid, medical care, good food and proud gang names.35
"Aliens or a lost civilisation built them." We have the quarries, the tools, the workers' town, the cemetery and a logbook written by a man who shipped the stone.36
"It took 100,000 men." That figure comes from Herodotus, writing about 2,000 years later. Modern estimates are about 20,000.1
"We have no idea how they did it." We know a lot. Only the exact ramp layout is still an open question.10

FAQ

How were the pyramids built, in simple words?

Teams of Egyptian workers cut limestone blocks with copper chisels and stone hammers, moved them on wooden sledges and by boat along the Nile, and raised them with ramps of mud brick, rubble and earth, using levers for fine positioning near the top.

Do we actually know how the pyramids were built?

We know a lot: who the workers were, where they lived, where the stone came from, what tools they used and how blocks travelled. The part still debated is exactly how the ramps were arranged to lift blocks to the top. Several designs are possible and none has been proven.

Were the pyramids built by slaves?

No. The evidence points to paid, well-fed Egyptian workers who served in rotating crews. They were buried in their own tombs beside the pyramids, some with injuries that had been treated, and their gangs had proud names like "Friends of Khufu".

How many people built the Great Pyramid?

The Greek writer Herodotus claimed 100,000 men, but he visited about 2,000 years later. Modern Egyptologists estimate around 20,000 workers including support staff such as bakers, with perhaps 10,000 doing the heavy stonework at any time.

How long did it take to build the pyramids?

The Great Pyramid is thought to have taken about 20 years, during the reign of King Khufu around 4,500 years ago. That works out at more than 300 blocks set every day.

Why were the pyramids built?

They were royal tombs. Egyptians believed the pyramid and its temples would help the king's spirit live on after death, which they thought kept the whole world in order.

Could pyramids be built today?

Yes. Experiments with copper tools, sledges and levers show ancient methods work. With modern cranes and trucks a pyramid would be far quicker, but cutting and placing 2.3 million blocks would still be a huge and expensive project.

Did this help it click?

Sources

  1. Encyclopaedia Britannica, Pyramids of Giza
  2. Encyclopaedia Britannica, Pyramid (architecture)
  3. PBS NOVA, Who Built the Pyramids? (interviews with Mark Lehner and Zahi Hawass)
  4. PBS NOVA, Excavating the Lost City (Mark Lehner, University of Chicago / AERA)
  5. Smithsonian Magazine, Uncovering Secrets of the Sphinx
  6. Smithsonian Magazine, The World's Oldest Papyrus and What It Can Tell Us About the Great Pyramids
  7. Fall et al., Sliding Friction on Wet and Dry Sand, Physical Review Letters 112, 175502 (2014)
  8. University of Amsterdam, Ancient Egyptians transported pyramid stones over wet sand
  9. Phys.org / FOM, Ancient Egyptians transported pyramid stones over wet sand
  10. Wikipedia, Egyptian pyramid construction techniques (citing Lehner, Arnold, Isler, Houdin)
  11. Wikipedia, Diary of Merer; and Great Pyramid of Giza (well-cited summaries)
  12. Egypt Exploration Society, Hatnub (University of Liverpool project)